Sichuan, Chengdu, Xindu District
3000m² ~ m² | Both | General

Reference number: W201605190106

Post Time 2016-05-19 15:47

Offer Deadline 2016-08-17 23:59

Type of demand

  • Both

Demand Size

  • 3000 m²

Commence date of warehouse service

  • Now

Product storage type

  • Electronics, Appliances, Parts, Raw materials, Others

Demand On Warehouse Type

  • General

Demand on warehouse location

  • Sichuan, Chengdu, Xindu District

Building Requirement

  • Single-Storey

Floor Finishes Requirement

  • Concrete, wear-resistant, Anti Dust, Dehumidify, Antistatic, Others

Loading Equipment

  • Hoist, Loading Platform, Dock Leveler, Elevator, Others

Operation equipment

  • Electric forklift, Manual forklift, Trolly, Weighbridge

Software System

  • WMS, TMS, OA, Others

Security System

  • Alarm, CCTV, Security

Fire Fighting System

  • Fire Sprinkler, Smoke Detector, Fire Bucket, Fire Hydrant, Fire Extinguisher, Insulting Layer, Fire Engine, Others

Supporting facilities

  • parking

Budget

  • Negotiable
Whatsapp Us +852 51988153 Monday to Friday 9.30am - 6.30pm (UTC+8)

Sign In